Topic: how can I deal with alternative flow in scea

  Print this page

1.how can I deal with alternative flow in scea Copy to clipboard
Posted by: yj780210
Posted on: 2003-05-21 08:51

as title

and

how can I persent another use case in sequence .in change Itinerary,how can I persent perpare Itinerary use case. in perpare Itinerary ,how can I persent price Itinerary use case?

2.Re:how can I deal with alternative flow in scea [Re: yj780210] Copy to clipboard
Posted by: jacob
Posted on: 2003-05-21 09:26

I don't know, too
but I write a note "go to .... use case", hehe, I think I will modify it later

3.Re:how can I deal with alternative flow in scea [Re: yj780210] Copy to clipboard
Posted by: yj780210
Posted on: 2003-05-21 13:40

i n javaranch's forum,someone said we can use usecase in sequence disgram directly.
do you know it is ok?I cann't do it in rose.

4.Re:how can I deal with alternative flow in scea [Re: yj780210] Copy to clipboard
Posted by: jacob
Posted on: 2003-05-21 18:34

I don't know, too
even I don't know how to express (for, while statement) in Rose....
do you know?

5.Re:how can I deal with alternative flow in scea [Re: yj780210] Copy to clipboard
Posted by: yj780210
Posted on: 2003-05-22 08:56

I think we can use [] to express for and while.

this is what I found in j2ee group

Constraints appears in the sequence diagram. I use some "if, else if, ..." features of TogetherSoft. To tell the truth, I

I am also using TogetherJ for the project, and I was using the conditional/iteration constructs for the sequence diagrams. However I have subsequently removed these because I believe that they are non compliant with the UML spec (I would be happy to be corrected here). I am now using the alternative '[]' and '*[]' adornments for messages to indicate conditional execution, and iteration respectively.

what do you think, jacob?

do you use local entity or dao?

6.Re:how can I deal with alternative flow in scea [Re: yj780210] Copy to clipboard
Posted by: jacob
Posted on: 2003-05-22 09:38

I know "[]", but I use Rose, I feel it lost some UML spec, no standard "if else", or no for ,while group(I think it is difficult to express a group use "[]")....
so I leave these problems for later....(now I just use some notes)

I use local entity and a big mounts of dao.
I think read-only data all can express with dao, others I use entity bean..
but in fact I feel use local or remote is not a big problem, I think sun should think all these two kinds are good, it depend on what you think the system should be.

by the way, I think It is just 12 points in sequence diagram...
and class, component are all 44 points, so I feel it is so waste time to have details in sequence.....
I think the most important is compnont, lots of people lost more scores in compnont.

I have msn even at work time,
jacobmee@hotmail.com

7.Re:how can I deal with alternative flow in scea [Re: jacob] Copy to clipboard
Posted by: yj780210
Posted on: 2003-05-22 09:55

jacob wrote:
I use local entity and a big mounts of dao.
I think read-only data all can express with dao, others I use entity bean..
but in fact I feel use local or remote is not a big problem, I think sun should think all these two kinds are good, it depend on what you think the system should be.

same to me Smile use dao to serve search ie .list flight,cheaper flight

jacob wrote:
by the way, I think It is just 12 points in sequence diagram...
and class, component are all 44 points, so I feel it is so waste time to have details in sequence.....
I think the most important is compnont, lots of people lost more scores in compnont.


this question is strange,I found someone got 44 in componont,but he just have one componont diagram.

I think document are most important part.one guy got 100% have 10-12 pages.

8.Re:how can I deal with alternative flow in scea [Re: yj780210] Copy to clipboard
Posted by: yj780210
Posted on: 2003-05-22 10:00

we cannot use chat soft in office,sorry.

yangj@topsst.com.cn

9.Re:how can I deal with alternative flow in scea [Re: jacob] Copy to clipboard
Posted by: jllu
Posted on: 2003-05-22 12:28

jacob wrote:
I know "[]", but I use Rose, I feel it lost some UML spec, no standard "if else", or no for ,while group(I think it is difficult to express a group use "[]")....
so I leave these problems for later....(now I just use some notes)

I use local entity and a big mounts of dao.
I think read-only data all can express with dao, others I use entity bean..
but in fact I feel use local or remote is not a big problem, I think sun should think all these two kinds are good, it depend on what you think the system should be.

by the way, I think It is just 12 points in sequence diagram...
and class, component are all 44 points, so I feel it is so waste time to have details in sequence.....
I think the most important is compnont, lots of people lost more scores in compnont.

I have msn even at work time,
jacobmee@hotmail.com

These are not required. Stick to the standard UML notation
Use "Note" to show alternative flow. put a note say "below is alternative flow for xxx".

10.Re:how can I deal with alternative flow in scea [Re: yj780210] Copy to clipboard
Posted by: yj780210
Posted on: 2003-05-22 13:07

thax jilu and jacob
did you use any message dirven bean for mail system?

11.Re:how can I deal with alternative flow in scea [Re: yj780210] Copy to clipboard
Posted by: jacob
Posted on: 2003-05-22 19:13

....
I think I will use message dirven bean,(but now I havn't go so far, hehe)
but I think it is clear sun need you to express asychronize system(I think)


   Powered by Jute Powerful Forum® Version Jute 1.5.6 Ent
Copyright © 2002-2021 Cjsdn Team. All Righits Reserved. 闽ICP备05005120号-1
客服电话 18559299278    客服信箱 714923@qq.com    客服QQ 714923